About Retech

Manufacturing & Quality Control

How a configured system becomes a tested, documented line that can be installed and run at your site.

Manufacturing

Seven Stages From Design to Documentation

Each stage produces something the next stage depends on, which is why the sequence is fixed.

01

Design & Engineering

Process route and equipment configuration are fixed against the actual material, contamination level and target output — not against a standard machine list.

02

Fabrication

Frames, tanks, chutes and screw assemblies are fabricated and assembled in-house. Wetted parts use stainless steel where the process requires it.

03

Component Selection

Drive, electrical and bearing components are selected from named international brands so that spares remain obtainable over the life of the line.

04

Assembly & Alignment

Machines are assembled, aligned and wired before testing. Alignment and clearances are checked at this stage.

05

Electrical & Control Check

Control panels, interlocks, safety circuits and instrumentation are verified against the electrical drawings.

06

Factory Test

The line or machine is run before shipment. Where customer material is available, a material trial is carried out. Test scope is defined in the project agreement.

07

Inspection & Documentation

Layout and foundation drawings, utility requirements, operation and maintenance manuals, electrical diagrams and inspection records are prepared for handover.

Quality Control

What Is Checked, and When

Incoming Components

Named-brand drive, electrical and bearing components are used so that replacements remain obtainable.

Fabrication Quality

Wetted parts and wear surfaces are specified by the material being processed — abrasive or corrosive streams change the material selection.

Assembly & Alignment

Alignment, clearances and torque are checked during assembly rather than corrected on site.

Electrical & Safety

Control panels, interlocks and safety circuits are verified against the drawings before the test run.

Factory Test

Function and running tests are carried out before shipment; material trials where customer material is available.

Documentation

Drawings, utility requirements, manuals and inspection records are prepared for handover.

Test scope, documentation package and warranty terms are agreed per project. ' '